Customization: | Available |
---|---|
After-sales Service: | One Year Remote Warranty |
Application: | Viscous Fluid |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The main equipment of Adhesive Production Line:
Batch Capacity
|
500-3,000 KG
|
System Capacity
|
300-10,000 T/year
|
Application Materials
|
* Single-component adhesives and two-components adhesives: * Polyurethane adhesives, epoxy adhesives, rubber adhesives, etc. * PU sealants, silicone sealants, electronic sealants, acrylic sealant, structural adhesive, white glue, etc. * Dental sealants and materials; |
Mixing Equipment
|
Various slurries with viscosity less than 1,000,000cps, solid content under 90% such as battery paste, solder paste, ceramic paste, silicone inks, sealants, structural adhesives, soft cream, jam etc.
|
Mixing Equipment
|
SXJB series: Powerful Planetary Dispersing Mixer
SJBD series: Dual shaft Multi-functional Dispersing Mixer, Triple shaft Multi-functional Dispersing Mixer
|
Heating Method
|
Water Heating, Oil Heating, Steam Heating
|
Vacuum Type
|
Rotary Vane Vacuum PumpWater Ring Vacuum Pump (vacuum drying)
|
Discharge System
|
Fixed type (Discharge from top of pressing plate)Tank lifting type (Discharge from the tank bottom outlet) Note: protection grid/door optional |
Filling Method
|
Semi-auto Filling Machine, Auto Filling Machine, suitable for filling 300ml cartridge;Filling pails (1kg, 25kg, 200kgs ect.)
|
Characteristics
|
Various types of blades can be selected according to the viscosity and characteristics of materials;Tank automatic moving on the track; Automatic raw materials batching and feeding; High automation degree. |
1,Payment terms?
A1 L/C, T/T, D/P,cash, Alibaba trade assurance;
2,Trade terms?
A2 In according with Incoterms 2010, normally with EXW, FOB Shanghai, CFR, CIP CIF and DDU;
3,Validity of quotation?
A3 Within 30 days;
4,Modes of shipment?
A4 By sea, by railway, by air and by express;
5,Warranty?
A5 One year and lifelong service provided at cost;
6,Installation & Commissioning & Training?
A6 For single set of machine, usu. tel or mail guidance for installation;For production line, paid overseas engineering service provided to customers'factory for installation and debugging, as well as training the worker to use the production line.